Dams and Reservoirs

Terme Stream

  • Application Projects

Nizip Stream

  • Flood control project

Akbaş HEPP

  • Final Design
  • Application Projects

Çakmak 2 HEPP

  • Consultancy
  • Construction Inspection

Mil HEPP

  • Consultancy

Kaleköy Weir and HEPP

  • Consultancy

Demirciler HEPP

  • Final Feasibility Report

Kavakçalı HEPP

  • Final Feasibility Report

Karasu 1 HEPP

  • Feasibility Report

Karasu 4.2 HEPP

  • Feasibility Report

Karasu 4.3 HEPP

  • Feasibility Report

Karasu 5 HEPP

  • Feasibility Report

Asarcık Regülatörü ve HES

  • Fizibilite Raporu

Koçak Dam and HEPP

  • Fianl Feasibility Report

Çaygözü HEPP

  • Final Design

Hanak I HEPP

  • Consultancy

Samsun  Vezirköprü

  • 1st part flood control

Samsun Vezirköprü

  • 1.kısım taşkın koruma

Nizip Stream

  • Flood control project

Rize Güneysu

  • Taşlıdere valley stream correction
  • 6th part construction
  • Application Projects

Çakmak I HEPP

  • Consultancy
  • Construction Inspection

Söğütlü HEPP

  • Consultancy
  • Construction Inspection

Oskara HEPP

  • Feasibility Report
  • Final Design

Derinçay Weir and HEPP

  • Feasibility Report

Ağasar HEPP

  • Feasibility Report

Geyikli HEPP

  • Feasibility Report

Uğur I ve II HEPP

  • Feasibility Report

Manahoz Weir and HEPP

  • Feasibility Report

Duru Dam and HEPP

  • Feasibility Report

Özgüven Weir and HEPP

  • Feasibility Report

Sarmaşık Weir and HEPP

  • Feasibility Report

Kuyma HEPP

  • Final Feasibility Report

Göksu Dam and HEPP

  • Feasibility Report

Hanak II HEPP

  • Consultancy

Pasinler HEPP

  • Feasibility Report